The project has a very tight delivery schedule and will be carried out by our TEKLA team in Pakistan.
In total, the shop drawings for 190 structures will be produced in the English language first, and then AS-IS drawings will be translated into Russian for the end-user benefit.
Fabrication will also take place for 17 Tons in our workshop.
[Edit 10.03.2022] Bellelli has delivered the shop drawings for 166 out of the 190 structures and 8 tons of prefabrication. Unfortunately, due to the recent geopolitical developments and subsequent sanctions imposed by the EU to the end-user country, the Project was canceled.